Load-in is the period before an event when freight, equipment and booth materials arrive at the venue and are installed.
Trucks arrive at the dock on a schedule, freight is moved to its assigned space, booths and staging are built, power and rigging go in, and the room is turned over for show open. It runs on a timetable set by the venue and the general service contractor, not by you.
Most venues have fewer doors than exhibitors, so arrivals are assigned to time windows. Missing yours means waiting, and waiting costs labor that is already on the clock. This is the main argument for sending freight to the advance warehouse instead.
Rigging before booths, big structures before small, carpet before furniture, and anything needing power before the floor is covered. Getting the order wrong means moving things twice, which is where load-in overruns come from.
Everyone leaves at once, empty crates have to come back from storage before anything can be packed, and the venue usually wants the hall clear by a hard deadline. Build in more time than feels necessary. See exhibitor management software.